Steel Coil Processing · Sheet Metal Fabrication · Material Supply | Baoshan, Shanghai Mon–Fri 8:30–17:30 (GMT+8)

Shearing & Delivery

Slitting · Cut-to-Length · Just-in-Time Delivery

SHEARING & DELIVERY

What We Do

Not coil, but blanks cut to a drawing, at the line side, on the day the schedule says.

Customers do not buy coil.They buy blanks cut to a drawing, at the line side, on the day the schedule says.

The middle step: slit to width, cut to length, level, and ship on the daily call-off.Two slitting lines and one high-speed cut-to-length line, plus its own fleet.

East China is same-day or next-day.Every lot ships with a mill certificate, and the heat number traces back to the mother coil.

Tolerances tighter than the standard table are stated at the enquiry stage.Better to decline than to ship blanks a press rejects.

Tight tolerances

Cut length held to ±0.5 mm.

Full traceability

Mill certificate and heat number in every lot.

JIT to the line side

Shipped on the daily call-off plan.

What We Do
SPECIFICATIONS

Processing Capabilities

The figures asked about most; anything outside these ranges is a separate enquiry.

Item Range / value Unit Note
Applicable materials 冷轧、热轧、镀锌、酸洗、不锈钢 — Grade as per your drawing
Thickness range 0.3 – 6.0 * mm Upper limit depends on steel strength
Slit width 20 – 1,650 * mm Narrowest slit 20 mm
Cut length 200 – 6,000 * mm Long lengths need advance scheduling
Cut length tolerance ±0.5 * mm Measured within 1 m
Burr height ≤ 0.05 * mm Standard tooling condition
Max coil weight 25 * t Limited by crane and decoiler
Packaging 木托 / 铁托 / 纸角+缠绕膜 — To your line requirement
Standard lead time 24 – 72 * 小时 East China, subject to schedule
Minimum order 3 * 吨 Multiple sizes combine
* Values marked * are pending equipment verification and are confirmed on the processing order. Tolerances vary slightly between heats.
WORKFLOW

How an Order Runs

From order to delivery, four steps, with no chasing required.

01

Confirm the order

We confirm grade, tolerance, quantity and address, then issue a processing order.

02

Schedule and slit

Scheduled against due date and tool condition; the batch starts after the first piece measures in.

03

Measure and label

Length, width and burr sampled; labeled and packed to your line requirement.

04

Pack and deliver

Own trucks on the daily plan; certificate and delivery note travel with the load.

FAQ

FAQ

QWhat is your minimum order quantity? Can you take small lots?
AStandard slitting starts at 3 t, and multiple sizes combine. For trials and pre-production volumes we quote per project — as long as it covers decoiling and tool set-up, we will run it.
QWhich mills do you buy from? Can we specify one?
AStock is mainly Baosteel, Ansteel and Shougang. You can specify mill and grade; we buy to that specification and pass on the matching mill certificate.
QWhat tolerance can you hold?
ALength ±0.5 mm and slit width ±0.05 mm as standard. Tighter or unusual requirements are written into the processing order.
A bill of material is enough to judge feasibility, then lead time.

PDF or Excel both work. We reply with feasibility and a price band within 2 working hours.